How Long Does It Take to Remodel a Kitchen? A Simple Guide

How Long Does It Take to Remodel a Kitchen? A Simple Guide

Got your heart set on a new kitchen? Are you dreaming of taking everything out and starting fresh?

When it comes to remodeling a kitchen, you’ll quickly tire of washing dishes in the bathtub and microwaving every meal. No matter how fast it happens, it will feel like it’s taking forever.

How long does it take to remodel a kitchen, and what are the steps involved? Whether you’re going for cosmetic upgrades or a full luxury kitchen remodel has a lot to do with your timeline. Let’s walk through the major parts of a kitchen remodel to see.

Planning

This stage starts with your dream, then hits reality once you set your budget. Cosmetic improvements like painting cabinets and hardware can run $5,000, while taking out walls and changing the layout can balloon the budget to $50,000 or more.

A key part of planning is hiring people who know how to remodel a kitchen. This might be a kitchen designer to help with layout planning but will definitely involve your general contractor. Once in place, they can get the permits and approvals you need for construction work.

Choosing materials will take the bulk of your time. Carry samples of what you’ve already settled on anytime you go to look at new items to ensure it all works together.

Common Timeframe: Take as long as you want! Or at least as long as you can stand your current kitchen. It’s better to take your time than to rush into the remodel.

Demolition

Unless you’re trying to save or reuse items, this is the fastest stage of the process. You have to rip everything out before it can be put back together with the new items you’ve chosen.

Your contractor should work with you to keep the demo from invading the rest of the house, as well as have a plan for keeping anything you reuse, like your fridge or trim. You’ll want the fridge plugged in somewhere you can access so you can use it!

Common Timeframe: This stage should only take a couple of days unless you’re trying to save or salvage things for reuse.

Installation

All the old is gone now, so in with the new. The steps might vary in order, but this is the basic kitchen remodel process if you’re starting from scratch.

The construction phase is when any structural changes like tearing out a wall will happen. While you’re down to the studs, updates to the electrical and plumbing can happen easily, so you can move appliances around or add more outlets. The new walls should go up pretty quickly after that.

Next come the cabinets, since their placement serves as the foundation for everything else. Once they’re in, the countertops, flooring, and appliances can be put into place. The order here could vary based on what your contractor prefers for ease of working.

That leaves the “small” things like light fixtures, paint, and accessories to be installed. You’ll then need a thorough cleaning job before you start moving in.

Common Timeframe: A full installation can take three to five weeks, depending on the size of your space. Delays come from failing to pass inspection, materials not arriving on time, or change orders.

How Long Does It Take to Remodel a Kitchen?

So, how long does it take to remodel a kitchen? A lot depends on the amount of work you’re doing, but expect your kitchen remodel timeline to take as little as two weeks for a small job to 10 weeks for a large kitchen. You can do your bit to keep things on track and running smoothly by making all the decisions before the work even begins.

Check out other articles on our site for more on remodeling, maintaining, and cleaning your house.